# 工作方式选择表 / Workflow decision sheet

## 开始前 / Before starting

- 我能审查差异并运行项目吗？/ Can I review changes and run the project? ______
- 若不能，谁来帮我验收？/ If not, who will help review? ______
- 本轮唯一要解决的问题是什么？/ What single problem does this run address? ______
- 预期输入、输出和不变的行为？/ Inputs, outputs and behavior to preserve? ______
- 我允许改哪些文件、运行哪些命令？/ Allowed files and commands? ______

## 选择 / Choose

| 工作方式 / Workflow | 适合 / Useful when | 核对 / Check |
|---|---|---|
| 编辑器 / Editor | 边读边改，逐段看差异 / Review small changes as you go | 相关文件上下文、无关修改 / Context and unrelated changes |
| 终端 / Terminal | 熟悉命令与环境 / Comfortable with commands and environment | 工作目录、命令权限 / Directory and command permissions |
| 委派 PR / Delegated PR | 任务明确，可以集中审查 / Clear task, asynchronous review | PR 差异、执行记录、验收结果 / Diff, execution record, acceptance |

没有审查能力先找协助；没有验收条件先拆小任务；两者具备后按熟悉方式开始。这是编辑建议，不是产品性能排名。

Find review help if needed; narrow the task if criteria are missing; otherwise start with your familiar workflow. This is editorial guidance, not a product ranking.

## 结束后 / After the run

- 哪一步必须由我补充上下文？/ Where did I need to add context? ______
- 哪一步出现错误或越出范围？/ Where did errors or scope drift occur? ______
- 我花了多少时间看差异和验收？/ How much time did review and acceptance take? ______
- 哪些结果有原始输出支持，哪些没检查？/ Which results have output evidence? What remains unchecked? ______
- 下一轮最小可交付任务？/ Smallest deliverable for the next run? ______

一次练习不代表总体能力。对比需保持任务、初始文件和验收条件相同，并记录模型、权限和操作差异。

One exercise does not measure overall capability. Keep tasks, starting files and criteria consistent and record model, permissions and operator differences.
